


Well when my dad was in college he was into photography and he did a shoot that was of two chairs there was a lot of really cool composition. This is my throwback to him however I focused on angles instead of composition mostly because I have a test and two quizzes tomorrow and angles are faster than messing with lighting.
No comments:
Post a Comment